PIPELINE CONSTRUCTION: STEP BY STEP GUIDE

September 25, 2018

Step 1: Construction Staging Areas & Storage Yards

In order to construct a pipeline, staging areas and storage yards are cleared, strategically located along the planned right-of-way. These areas are used to stockpile pipe and to store fuel tanks, sand bags, silt fencing, stakes, and equipment parts. They provide parking for construction equipment, employee trucks, and locations for office trailers.

Staging areas are cleared and covered in rough stone gravel, often reinforced with large wood timber matting. These areas can be located in fields, pasture, or forested land and can impact streams and wetlands. Often, these areas require the construction of access roads to and from paved roads, and to and from the areas to the pipeline ROW.


Step 2: Clear Cutting the ROW

After the equipment is accessible in the staging area, work will begin to clear cut the pipeline right-of-way. Landowners have the option of selling the timber themselves, or allowing the company responsibility for its sale or disposal. Large trees are stockpiled or hauled off, while the branches and tree tops are placed into piles and burned. A stump grinder then removes the remaining tree stumps in the ROW.

The trench for the pipeline is dug after the ROW is cleared of trees. As seen in several of the photos below, the hillsides are so steep that trench diggers are lowered and secured to larger bulldozers with a tether line. If rocks ledges are encountered, track hoes with jack hammers are brought in to create the trench. Sandbags are placed within the trench to restrict water flow and to support the pipe.

Step 4: Pipe Transport, Stringing, & Assembly

When the trench is completed, pre-coated segments of pipe, usually 40 ft in length, are transported from stockpiles in the staging area to the right-of-way. Pipes are laid above ground beside the trench, or within the trench on top of supportive sandbags in steep terrain. Certain pipe sections are bent using a pipe bending tool to allow the pipeline to follow the planned route and the terrain. The pipe sections will then be welded together, sand blasted, and the weld joints coated with epoxy to prevent corrosion. Finally, the weld joints are inspected with x-ray to ensure their quality. Connected lengths of pipe can then be lowered into the trench

Step 5: Obstacles: Roads & Streams

Pipelines cross existing roads, highways, streams, rivers and wetlands. Typically, pipelines are constructed underneath these obstacles by either boring for shallow depth or using horizontal directional drilling (HDD) for deeper placement. Other obstacles include abandoned mines, karst topography, and densely populated areas. Each obstacles requires a unique method and order of operations.

Step 6: Testing & Restoration

After the pipe is inspected, the trench is filled in. Before completing the project, the pipeline integrity must be verified using hydrostatic testing. Pipeline companies receive permits to withdraw millions of gallons of water from streams and rivers along the pipeline path. This water is sent through the pipeline and the pressure is increased to above the maximum operational level. If the pipeline remains intact during this test, it is deemed operational. After this, the surface of the ROW is seeded and fertilized, and above-ground markers are placed along the pipeline path.

if you require any steel pipeline fittings , flanges , pipeline components , please feel free to contact www.bd-pipefitting.com


문의하기

Author:

Ms. Sunny Peng

Phone/WhatsApp:

+8618333120628

인기 상품
뉴스
합금 강관 피팅

September 13, 2022

원활한 강관 및 피팅

September 13, 2022

You may also like
Related Categories

이 업체에게 이메일로 보내기

제목:
이메일:
메시지:

Your message must be betwwen 20-8000 characters

문의하기

Author:

Ms. Sunny Peng

Phone/WhatsApp:

+8618333120628

인기 상품
뉴스
합금 강관 피팅

September 13, 2022

원활한 강관 및 피팅

September 13, 2022

공급 업체와 통신?공급 업체
Sunny Peng Ms. Sunny Peng
나는 당신을 위해 무엇을 할 수 있습니까?
공급 업체에 문의하십시오